What structured cabling means

Structured cabling is the organized, standards-based network wiring in a building: cables from a central telecom room to every workstation, Wi-Fi access point, camera, phone and door controller. The alternative, cables added one at a time over the years, ends in a tangle nobody can trace.

Done properly, it is designed, labelled, tested and documented, so moves and changes are quick and troubleshooting does not mean opening the ceiling.

For most businesses, cabling outlasts several generations of computers, phones and switches. That makes it one of the few network investments you make once per fit-out, so it is worth getting right.

The pieces

  • Telecom room or rack: switches, patch panels and often the UPS.
  • Horizontal cabling: permanent runs from the patch panel to wall or ceiling outlets.
  • Backbone: links between telecom rooms or floors, often fibre.
  • Work area outlets and patch cords: the short connections at each end.
  • Pathways: cable tray, J-hooks, conduit and sleeves that carry and protect the cable.
FIG 01Alberta Electrical
A switch connects by patch cord to a patch panel, then a permanent link cable through the building of up to 90 metres to a wall outlet, then a patch cord to the device, totalling 100 metres.THE 100 METRE CHANNELswitchpatchpaneldevicewall outletpermanent link: up to 90 min walls and ceilingsfull channel including patch cords: 100 mpatchpatch
A horizontal channel is a permanent link of up to 90 metres plus patch cords, for 100 metres in total.

Industry standards for copper Ethernet limit a horizontal channel to 100 metres, with the permanent link up to 90 metres. In large single-storey buildings, warehouses and shops, that limit is the reason to plan a second telecom location or a fibre run.

Choosing cable

FIG 02Alberta Electrical
Cross-sections of Cat 6, Cat 6A with a separator, and fibre cables, plus a note that the cable jacket fire rating must match the installation space.COMMON CABLE TYPESCat 6 UTPmost officesCat 6A10G, Wi-Fi APs, PoEFibrebackbone, long runsFT4 / FT6Jacket ratingmatches spacePlenum spaces and risers need cable with the fire rating the code requires for that location.Your designer specifies the rating; it is printed on the jacket.
Copper category cable serves most outlets, fibre handles backbones and long runs, and the jacket rating must suit the space.
  • Cat 6 is the common baseline for offices and handles gigabit networks comfortably.
  • Cat 6A supports higher speeds over the full distance and handles the heat from high-power PoE better. A good choice for Wi-Fi access points and new builds expected to last.
  • Fibre for backbones, between buildings, and for long runs to yard cameras or outbuildings, since it is not affected by distance or electrical noise in the same way.
  • Jacket rating matters as much as category. Cable in plenum spaces and vertical risers must carry the fire rating the code requires for that location.
Good to knowPower over Ethernet

Cameras, access points, phones and many door controllers draw power over the data cable. Higher PoE power means more heat in cable bundles, which is another reason to plan bundle sizes and cable category carefully.

Choose connectors, patch panels and outlets rated for the same category as the cable. Mixing a Cat 6A cable with lower-rated components brings the whole link down to the weakest part.

Installation that lasts

FIG 03Alberta Electrical
Section through a ceiling space with a data cable tray, a power conduit kept at a distance, light fixtures to avoid, and J-hooks supporting cable where there is no tray.SEPARATION FROM POWER IN THE CEILING (SECTION)deck aboveT-bar ceilingcable tray: datapower conduitkeep separationcross at 90 degreeslight fixture: avoidJ-hooks where no traypipe: never tie cable to it
Data cable rides its own tray or J-hooks, kept apart from power and light fixtures and crossing power at right angles.
  • Keep data cable apart from power wiring and fluorescent or LED drivers, and cross power at right angles.
  • Support cable on tray or J-hooks. Never lay it on ceiling tiles or tie it to pipes, sprinkler lines or ductwork.
  • Respect bend radius and do not overtighten cable ties.
  • Firestop every penetration through a fire-rated wall or floor.
  • Leave a service loop at the rack, and label both ends of every cable to the same scheme.

Plan the telecom room as carefully as the cabling. It needs enough wall or rack space, a dedicated circuit for the network equipment, a proper bonding connection, cooling for the switches, and secure access. In small offices that room is often a closet, which works fine if it is planned that way from the start.

Testing and documentation

Every new run should be tested with a certification tester to confirm it meets its category's performance. The test report, labels and a floor plan with outlet numbers are what you are actually paying for: they turn a pile of cable into a maintainable system.

DeliverableWhy it matters
Certification test resultsProves each link meets its category
Labelling to a single schemeFind any cable from either end
As-built floor planPlan moves and troubleshoot fast
Rack elevationShows what is plugged in where

Ask for these documents in the quote so they are part of the job, not an afterthought.

Planning a project

  1. Count outlets per workstation and add spare capacity.
  2. Locate Wi-Fi access points, cameras, door controllers and printers.
  3. Check distances to the telecom room and plan fibre where needed.
  4. Coordinate with the electrical layout and ceiling trades early in a tenant improvement.
  5. Plan power for the rack, see powering a server or data room.

Our structured cabling team designs, installs, tests and documents cabling alongside the electrical work, so pathways and power line up the first time.

TipPull spares now

Adding a cable while the ceiling is open is quick. Adding one after the tenants move in is disruptive. Pull a few extra runs to likely spots.

If you are taking over an existing space, ask for the previous tenant's test results and drawings. Untested or undocumented cabling can sometimes be kept after testing, but it should not be assumed to work.

Common questions

Should I install Cat 6 or Cat 6A?

Cat 6 suits most office workstations. Cat 6A is worth it for Wi-Fi access points, high-power PoE devices and spaces you expect to keep for many years.

How long can an Ethernet cable run be?

Copper channels are limited to 100 metres including patch cords, with up to 90 metres in the permanent link. Longer distances need fibre or another switch location.

Can data cable share a conduit with power?

No. Low-voltage data cable should be separated from power wiring as the code and cabling standards require.

Do I need my cabling tested?

Yes. Certification testing proves each run performs to its category and is the basis for any manufacturer warranty.

About this guideGeneral information, not a site assessment

Codes and permit rules change and every building is different. For work on your system, talk to a licensed electrician and your local permit authority.

Keep reading

More on backup power and security

All 13 guides →

Need an electrician?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service