Service
Heat tracing
Keep pipes flowing, roofs draining and processes at temperature through an Edmonton winter.
Heat tracing design, installation and maintenance for Edmonton homes, commercial buildings and industrial plants: pipes, roofs and gutters, and process lines.
Winter is our design condition
A frozen pipe in January is not a nuisance, it is a flood waiting for the thaw. An ice dam over an entrance is a falling hazard. A process line that cools below its set point can shut a plant down. Heat tracing prevents all three by adding a controlled amount of heat exactly where it is needed.
Alberta Electrical designs, installs and maintains heat tracing for houses, commercial buildings, parkades and industrial sites around Edmonton. Our work falls into four areas:
- Pipe heat tracing for water lines, fire sprinkler piping, drains and anything else that runs through cold space.
- Roof and gutter de-icing to keep meltwater moving off the roof instead of building ice dams.
- Process heat tracing to hold industrial lines and vessels at a set temperature, including in hazardous locations.
- Heat trace maintenance so existing systems actually work when the first cold snap arrives.
How heat tracing works
A heating cable runs along the pipe, gutter or vessel and is covered by insulation where possible. A thermostat or controller switches it on only when it is needed, based on air temperature, pipe temperature, or moisture on the roof.
The most common cable type we install is self-regulating: its output drops as it warms, which saves energy and reduces the risk of overheating. Constant-wattage and mineral-insulated (MI) cables have their place in long runs and high-temperature or high-exposure process work.
Every system is a set of listed parts meant to work together: cable, power connection, splices, tees, end seals and controls. Using the correct kits and terminating them properly is where most of the reliability comes from.
Safety and code
Heat tracing is covered by the Canadian Electrical Code as adopted in Alberta, which sets out wiring methods and requires ground-fault protection for most heating cable installations. That protection is there because a damaged cable under insulation or in a wet gutter can leak current without tripping an ordinary breaker.
Installations generally need a permit. In Edmonton, the City issues electrical permits; elsewhere it depends on the municipality. We take care of the permit and inspection as part of the job.
Store-bought heat cable plugged into an outdoor receptacle with an extension cord, wrapped with tape and covered with foam, causes fires every winter. If you rely on one, have it checked and replaced with a properly installed, protected circuit.
Homes, commercial and industrial
The same principles apply at every scale, but the details change. A house might need cable on two eaves and a downspout, plus a water line to a detached garage. A commercial building usually has parkade piping, sprinkler lines, roof drains and an entrance canopy. An industrial site can have hundreds of circuits feeding process lines, instruments and tanks, often in hazardous locations.
We size the work to the site. For homes, that means a tidy, safe installation with simple controls. For larger buildings and plants, it means circuit schedules, labelled panels, monitored controllers and test records that make the system easy to maintain for years.
Planning and cost
We do not quote prices online, because every system is different. What drives cost: the length of cable, the number of valves and fittings, the type of cable needed, insulation work, how far the circuit is from the panel, whether the panel has space, and the controls you choose. Simple ambient thermostats cost less up front; smarter controllers cost more but save energy every winter.
The best time to plan heat tracing is late summer or early fall, before the first hard freeze and before contractors' schedules fill. If something has already frozen, call our 24/7 line: we can help get flow back and plan a permanent fix.
For facilities with many circuits, we can also set up regular inspections and keep the records in our online job management system, so you can see which circuits were tested and what was found.
Questions we hear
Does heat tracing use a lot of power?
It depends on the cable, the length and how it is controlled. Self-regulating cable and good controls keep energy use down by heating only when needed.
Can heat tracing be added to existing pipes?
Yes. Most jobs are retrofits. Insulation is removed and reinstalled, or replaced, around the new cable.
Is a permit required?
In most cases, yes. We arrange it and the inspection.
Do you handle emergency freeze-ups?
Yes. Our 24/7 line takes calls for frozen lines and failed heat trace circuits.
How this job runs
What to expect
Assess
We look at what needs protecting, the surrounding conditions and the electrical supply available.
Design
Cable type, length, circuit sizing and controls are selected and laid out on a drawing or sketch.
Install and test
Cable, kits and controls are installed, insulation is coordinated, and every circuit is insulation-resistance tested.
Commission and maintain
We verify the controls, label the circuits and set up a pre-winter check schedule if you want one.
Related
Heat tracing services
Pipe heat tracing
Pipe heat tracing for Edmonton homes, commercial buildings and parkades: design, cable installation, controls, insulation coordination and testing.
View service →Heat tracingRoof and gutter de-icing
Roof, gutter and downspout de-icing cable for Edmonton homes and commercial buildings, with proper circuits, snow and moisture controls, and safe installation.
View service →Heat tracingProcess heat tracing
Process heat tracing installation and upgrades for Alberta industrial sites: temperature maintenance, controls and monitoring, hazardous-location work and commissioning.
View service →Heat tracingHeat trace maintenance
Pre-winter inspection, testing and repair of heat tracing systems for Edmonton buildings and industrial sites, with records you can track year to year.
View service →Guides
Read before you book
Block heater outlets and timers for Edmonton driveways
How a proper outdoor outlet for your block heater should be set up, why a timer saves power, and when a parking lot needs a load controller.
Read the guide →Winter, heating and heat tracing · 7 minHeat tracing basics: how heat trace keeps things from freezing
A plain-language introduction to electric heat tracing: what it is, where it is used in Edmonton, the parts of a proper system and why installation matters.
Read the guide →Winter, heating and heat tracing · 7 minSelf-regulating vs constant wattage heat trace
How the two main types of heating cable work, where each one makes sense, and the questions to ask before you choose.
Read the guide →Ready to book heat tracing?
Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.