What three-phase power is, the voltages you will meet in Alberta commercial buildings, and what to check before you buy equipment or lease a space.

7 min readFor businesses3 illustrations

Why three-phase matters to a business

Most houses run on single-phase power. Most commercial and industrial buildings run on three-phase. If you are leasing a shop, opening a restaurant or buying a compressor, CNC machine or commercial oven, knowing which you have, and at what voltage, saves expensive surprises.

FIG 01Alberta Electrical
Waveform drawing comparing one single-phase sine wave with three overlapping three-phase waves offset by 120 degrees.SINGLE-PHASE VS THREE-PHASESINGLE-PHASE: one wave, power dips to zero twice a cycleTHREE-PHASE: three waves 120 degrees apart, power never drops to zeroA B C phases: smoother power for motors, smaller wire for the same load
Single-phase power rises and falls through zero twice per cycle, while three overlapping phases deliver smoother, continuous power.

Three-phase supplies power as three alternating currents, each offset by a third of a cycle. The result is smoother power with no dead spots. Motors run more efficiently and start more easily, and for the same power the wire can be smaller.

Voltages you will see in Alberta

SystemWhere you find itTypical uses
120/240 V single-phaseHouses, small strip-mall units, some older shopsLights, receptacles, small equipment
120/208 V three-phaseMany retail units, offices, restaurants, apartment buildingsReceptacles at 120 V; HVAC, ovens and motors at 208 V
347/600 V three-phaseLarger commercial, industrial and warehouse buildings600 V motors and equipment, 347 V lighting

Other systems exist, especially in older or specialised buildings, so always confirm with the landlord, the building's electrical drawings or an electrician. The nameplate on the main switchboard is a good place to start.

FIG 02Alberta Electrical
Wye diagram with three phases A, B and C radiating from a neutral, labelled 120 V phase to neutral and 208 V phase to phase, with a table of what equipment runs on each.120/208 V WYE: WHERE THE VOLTAGES COME FROMNABC120 V208 V phase to phaseWHAT RUNS ON WHATphase to neutral, 120 V:receptacles, lightingtwo phases, 208 V:rooftop units, ovens,some EV chargersall three phases, 208 V:motors, compressors,larger HVAC
In a 120/208 V wye system each phase is 120 V to neutral and 208 V between any two phases.

The 208 V vs 240 V trap

This is one of the most common equipment problems in small businesses. Much commercial kitchen and shop equipment is sold in both 208 V and 240 V versions. A heating appliance built for 240 V will still run on 208 V, but at roughly three quarters of its rated output. Ovens take longer to heat, fryers recover slowly and heaters fall short in January.

TipCheck before you order

Before buying equipment, confirm the building's voltage and phase and order the matching model. Motors and controls can be more sensitive than heaters, so check with the supplier as well as your electrician.

In a 347/600 V building, most 120 V and 208 V loads are fed through a step-down transformer and a separate panel. Large equipment may be available in a 600 V version that avoids the transformer altogether.

FIG 03Alberta Electrical
One-line diagram of a 347/600 V building: utility to main switchboard, feeding 600 V motors, 347 V lighting and a step-down transformer to a 120/208 V panel.TYPICAL 347/600 V BUILDINGUTILITYMAINSWITCHBOARD600 V MOTORS347 V LIGHTINGSTEP-DOWNTRANSFORMER120/208 VPANELreceptacles, small loads347/600 V is common in Canadian commercial and industrial buildings.
A 347/600 V building feeds motors at 600 V and lighting at 347 V directly, with a step-down transformer for 120/208 V receptacles and small loads.

Balancing and planning panels

In a three-phase panel, single-phase loads are spread across the three phases so that each carries roughly the same current. A badly balanced panel can overload one phase while others sit idle, causing nuisance trips and overheating.

  • Ask for a panel schedule that shows the load on each phase, not just a list of circuits.
  • When adding equipment, let your electrician choose which breaker spaces to use.
  • For larger additions, a load calculation confirms the panel and service can handle it.
  • Keep spare capacity on each phase for future equipment.

If your space only has single-phase

Small units in older strip malls and converted buildings sometimes have only single-phase power. If your equipment needs three-phase, the options are:

  • Bring three-phase from the utility. This depends on what is available on the street or in the building. In Edmonton, EPCOR is usually the wire owner; elsewhere it is often FortisAlberta or another distributor. Availability, distance and transformer work drive the cost and the timeline.
  • Buy single-phase equipment where it exists, which is often the simplest answer for smaller machines.
  • Use a phase converter or drive for specific motor loads, chosen and sized with the equipment supplier and your electrician.
SafetyFind out before you sign

Changing a building's service can take months and depends on the utility. Confirm the supply before signing a lease or committing to equipment.

Working with an electrician

Bring the equipment list with nameplate voltages, phases and amps, along with the building's switchboard and panel information. Alberta Electrical handles tenant improvements, motor controls and switchgear upgrades, including design, permits and coordination with the utility.

Expect your electrician to ask about the hours the equipment runs, whether loads start together (several compressors at opening time, for example) and whether any equipment is sensitive to voltage dips. Those details shape the breaker sizes, the wire and sometimes the choice of motor starter or drive.

For ongoing peace of mind, a scheduled commercial maintenance visit can include thermal scanning of the panel and a check of phase balance as your business grows.

For restaurants and retail spaces, our retail and restaurant electrical team plans kitchen equipment circuits with the right voltage from the start.

Common questions

How do I know if my building has three-phase?

Check the nameplate on the main switchboard or panel, the building drawings, or ask the landlord. Three-pole breakers in the panel are a strong hint. An electrician can confirm.

Can I run 240 V equipment on 208 V?

Heating equipment usually runs, but at reduced output. Motors and controls may not be suitable. Check with the supplier and order the matching voltage when you can.

Is 600 V dangerous to have in my building?

All electrical systems need respect. 600 V equipment is normal in Canadian commercial buildings and is installed and maintained by licensed electricians. Keep electrical rooms closed and clear.

Why does my panel have three-pole breakers?

Three-pole breakers feed three-phase equipment such as motors, compressors and larger HVAC units. They switch all three phases together.

How long does it take to get three-phase service?

It depends on the utility, what is available nearby and the work involved. It can take months, so start early.

About this guideGeneral information, not a site assessment

Codes and permit rules change and every building is different. For work on your system, talk to a licensed electrician and your local permit authority.

Keep reading

More on panels, breakers and circuits

All 13 guides →

Need an electrician?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service