3400, 10180 101 St NW, Edmonton, AB T5J 3S424/7 service 1 (800) 716-8955
  1. Home
  2. Services
  3. Solar
  4. Solar micro-generation

Solar

Solar micro-generation

Applications, approvals and metering to connect your solar system legally to the Alberta grid.

ResidentialCommercialIndustrial

Help with Alberta micro-generation for solar: sizing, wire owner notification, permits, inspection and meter exchange for homes, farms and businesses.

What micro-generation means

In Alberta, a small generator that connects to the distribution grid to serve a home or business, using renewable or alternative energy, falls under the Micro-generation Regulation. The rules are administered by the Alberta Utilities Commission and carried out by the distribution utility (the wire owner) and your electricity retailer.

Being a micro-generator lets you export surplus solar to the grid and receive credit for it on your bill. In exchange, your system must meet sizing, safety and connection requirements, and you must not connect until the utility says so.

FIG 01Alberta Electrical
Five boxes in sequence: size to annual use, notify the wire owner, permits, install and inspect, and meter and connect highlighted in orange, with notes on the utility and retailer roles.Micro-generation, step by step1 Size toannual use2 Notifywire owner3 Permits(electrical +)4 Install+ inspect5 Meter+ connectWire owner: the distribution utility for your address(EPCOR in most of Edmonton; others elsewhere in Alberta)Retailer: credits exported energy on your billDo not energize until the utility authorizes connection.
Flow chart of the Alberta micro-generation process from sizing the system through notification, permits, installation and meter exchange.

Sizing to your use

A micro-generation system is intended to supply all or part of the site's own annual electricity use, not to be a business selling power. Your past consumption records are the starting point, and the application must show the system is sized accordingly. If you are adding major loads such as an EV, heat pump or a new building, the rules may let you account for that, depending on the details.

Systems are also grouped by size, with smaller systems following a simpler process than larger ones. We confirm which path applies to your project and what the wire owner will need.

Good to knowRules change

The Micro-generation Regulation and its supporting rules have been updated over the years. We check current requirements for each application, and you can review them through the Alberta Utilities Commission.

The paperwork we handle

  • Collecting your consumption history and site ID from your bill.
  • Preparing the notice or application with system details, inverter information and a single-line diagram.
  • Submitting to the wire owner for your address and answering their questions.
  • Applying for the electrical permit, and any building or development permit your municipality requires.
  • Scheduling the inspection and coordinating the meter exchange.
  • Telling you what to send your retailer so exports are credited.

Each party has a role. The wire owner approves the connection and changes the meter. The permit authority, which in Edmonton is the City, inspects the electrical work. Your retailer applies credits to your bill. Keeping them in step is most of the job.

FIG 02Alberta Electrical
A meter face with import and export readings, a grey arrow coming in from the grid and an orange arrow going out to the grid, with notes about night import and midday export.What the bidirectional meter recordsIMPORTEXPORTfrom gridto gridSeparate registers, both directionsNight, winter:you importSunny midday:surplus exports
Diagram of a bidirectional meter recording energy imported from the grid and energy exported from a solar system as separate readings.

Good records make future changes easier, so we give you copies of the approvals, the permit, the inspection result and the as-built single-line diagram at the end of the job.

Credits and your bill

Exported energy is credited on your bill under the rules that apply to your system size and your retailer's terms. Rates and how credits work vary by retailer and plan, and some retailers offer plans designed for solar customers. Ask your retailer how credits are calculated before you sign a new plan.

Delivery charges and other bill items are handled differently from energy, so solar rarely brings a bill all the way to zero every month. Your summer surplus and winter use balance out over the year in a way that depends on your plan.

Monitoring helps here. Your inverter app shows what the panels produce, and your bill shows what was exported. Comparing the two over a few months tells you how much of your solar you use directly and how much goes to the grid, which is useful if you are considering a battery later.

Expanding or changing a system

Adding panels, replacing an inverter or adding a battery can require an updated notice or application. Expansions must still meet the sizing rules. Tell us what you have and what you want to add, and we will tell you what the wire owner will need before any work starts.

SafetyDo not switch on early

Energizing a system before the utility authorizes it and the meter is changed can create safety hazards and billing problems. We commission only after approval.

Questions we hear

How long does approval take?

It varies with the utility's workload and the system size. Smaller systems are usually faster. We tell you what to expect when we apply.

Can you help if another company installed my panels?

Yes, we can help with applications and inspections, although we will need to review the installation first.

Do I need a special retailer?

No, but credits and rates vary by retailer and plan. Compare before you switch.

Does micro-generation apply to batteries?

Batteries connected with a micro-generation system are part of the application. We include them in the paperwork.

How this job runs

What to expect

  1. Gather information

    We collect your bills, site ID, system design and any planned new loads.

  2. Apply

    We prepare and submit the micro-generation notice or application and permit applications.

  3. Inspect

    After installation, the electrical inspection is completed and any deficiencies are cleared.

  4. Connect

    The wire owner exchanges the meter and authorizes connection, and we commission the system.

Related

More in Solar

Guides

Read before you book

All guides →
EV charging and solar · 8 min

Solar power basics for Alberta homes

How a grid-tied rooftop solar system works, why Alberta is a better place for solar than many people think, and what makes a roof a good or poor candidate in Edmonton.

Read the guide →
EV charging and solar · 8 min

Alberta micro-generation and net billing, explained

A plain-language guide to Alberta's Micro-generation Regulation: who qualifies, how you apply, how exported solar power is credited on your bill, and what to check before you sign.

Read the guide →
EV charging and solar · 7 min

How to size a home solar system

How a solar designer works out the right system size for an Alberta home, starting from your electricity bills and checking it against your roof, your panel and the micro-generation rules.

Read the guide →

Ready to book solar micro-generation?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service