Heat tracing

Heat trace maintenance

Find the failed circuit in October, not during the first -30 C night.

CommercialIndustrialResidential

Pre-winter inspection, testing and repair of heat tracing systems for Edmonton buildings and industrial sites, with records you can track year to year.

Heat trace fails quietly

Heat tracing sits idle for months, hidden under insulation or on a roof. Damage from other trades, water getting into insulation, a failed end seal or a controller knocked out of calibration often goes unnoticed until the system is needed. By then the pipe has frozen or the gutter is a block of ice.

A pre-winter check finds those problems while there is still time to fix them. For commercial and industrial owners with many circuits, it also builds a record that shows which circuits are getting worse.

  • Tripped ground-fault breakers that nobody reset
  • Thermostats set wrong or with failed sensors
  • Cable damaged by a ladder, a scaffold or a new pipe hanger
  • Insulation that is wet, crushed or missing
  • Kits and end seals that have let in moisture

What we test

Every circuit gets the same set of checks, and the results are recorded so this year's numbers can be compared with last year's.

FIG 01Alberta Electrical
A checklist with boxes for ground-fault trip test, insulation resistance, controller check, start-up current, visual inspection and logging deficiencies.Pre-winter check, per circuitBreaker and ground-fault device trip testInsulation resistance test, compared to last yearController set point, sensor and alarm checkCurrent draw at start-upVisual: kits, end seals, insulation, labelsDeficiencies logged and repair quotedResults posted to our online job management system
Checklist of the tests carried out on each heat tracing circuit before winter.

The insulation-resistance test is the most useful single measurement. A healthy circuit reads consistently high. A falling reading points to moisture or damage long before the circuit trips. Trending those numbers lets us plan repairs in good weather instead of during an emergency.

FIG 02Alberta Electrical
A trend line holding steady for three years then falling sharply toward an orange dashed minimum line, with a note suggesting wet insulation.Insulation resistance trend, one circuit20222023202420252026highlowminimum acceptabledrop: wet insulation?Comparing readings year to year finds failing cable early.
Line chart of one heat tracing circuit's insulation resistance over five years, dropping toward the minimum acceptable value.

Finding and fixing faults

When a circuit fails, we isolate it, test it, and narrow down where along the run the fault is. Common fixes are replacing a failed end seal or connection kit, cutting out and splicing a damaged section with the correct listed kit, drying or replacing wet insulation, and replacing controllers or sensors.

Sometimes the right answer is replacing the cable. Older constant-wattage cable, cable at the end of its life, or a system that never met the design is often better replaced than repaired again each winter.

TipThings you can safely check

Look at the heat trace controller or thermostat for a power or fault light, and check whether the heat trace breaker or ground-fault device has tripped. If it trips again after one reset, leave it off and call us. Repeated resets can mask a real fault.

SafetyDo not cut into insulation

Insulation on traced lines hides live cable. Do not cut, pierce or remove it without having the circuit isolated first.

Records that make sense

Good maintenance depends on knowing what you have. On many sites we find heat trace breakers labelled only as heat trace, controllers with no circuit numbers and cable runs that are not shown on any drawing. The first visit often focuses on building that inventory.

Each circuit gets a number that appears at the breaker, the controller and the power connection, and a one-page record with its location, length, cable type and test history. With that in place, the annual check becomes faster each year, and anyone on your team can tell which circuit serves which pipe.

That record is also useful for insurers and for planning capital work, because it shows which parts of the system are near the end of their life.

Setting up a program

For a single house with roof cable, a simple fall check is usually enough. For a commercial building, parkade or plant with dozens of circuits, we recommend a scheduled program: an inventory and labelling of every circuit, a test sheet per circuit, and annual testing before winter.

We post results and deficiencies to our online job management system, so you can see the status of every circuit and approve repairs without chasing paperwork. Cost depends on the number of circuits, access, whether we have good records to start from and the scope of repairs found.

If you are not sure where to start, a one-time assessment of your existing system is a good first step.

Questions we hear

When should heat trace be tested?

In late summer or early fall, before the first hard freeze, so repairs can be made in good weather.

Can you maintain a system someone else installed?

Yes. We often start by building an inventory and labelling circuits that were never documented.

Why does my heat trace breaker keep tripping?

Usually because of moisture or damage to the cable or a kit. Ground-fault protection is doing its job. Leave it off and have the circuit tested.

Do you handle emergency calls?

Yes. Our 24/7 line takes calls for failed heat trace and frozen lines.

How this job runs

What to expect

  1. Inventory

    We locate and label every circuit, controller and breaker, and build a test sheet for each.

  2. Test

    Ground-fault protection, insulation resistance, controls and start-up current are checked and recorded.

  3. Report

    You receive results and a prioritized list of deficiencies with repair recommendations.

  4. Repair and retest

    Approved repairs are completed and retested before the cold arrives.

Related

More in Heat tracing

Service

Heat tracing

Heat tracing design, installation and maintenance for Edmonton homes, commercial buildings and industrial plants: pipes, roofs and gutters, and process lines.

View service →
Heat tracing

Pipe heat tracing

Pipe heat tracing for Edmonton homes, commercial buildings and parkades: design, cable installation, controls, insulation coordination and testing.

View service →
Heat tracing

Roof and gutter de-icing

Roof, gutter and downspout de-icing cable for Edmonton homes and commercial buildings, with proper circuits, snow and moisture controls, and safe installation.

View service →
Heat tracing

Process heat tracing

Process heat tracing installation and upgrades for Alberta industrial sites: temperature maintenance, controls and monitoring, hazardous-location work and commissioning.

View service →

Guides

Read before you book

All guides →

Ready to book heat trace maintenance?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service