3400, 10180 101 St NW, Edmonton, AB T5J 3S424/7 service 1 (800) 716-8955
  1. Home
  2. Services
  3. Heat tracing
  4. Pipe heat tracing

Heat tracing

Pipe heat tracing

Freeze protection for water, sprinkler and drain lines that run through cold spaces.

CommercialIndustrialResidential

Pipe heat tracing for Edmonton homes, commercial buildings and parkades: design, cable installation, controls, insulation coordination and testing.

Which pipes need it

Any pipe carrying water through a space that can drop below freezing is a candidate. In Edmonton that is a long list: parkades, loading docks, crawlspaces, attics, exterior walls in older buildings, and lines that cross a cold garage or run outside.

  • Domestic water lines in unheated parkades and crawlspaces
  • Fire sprinkler mains and branch lines in cold areas
  • Drain and condensate lines, including roof drain leaders
  • Water lines to trailers, outbuildings and livestock waterers
  • Holding tanks and their fill lines

Insulation alone only slows heat loss. When the water stops moving overnight or over a long weekend at -30 C, an insulated pipe will still freeze. Heat tracing replaces the heat that the insulation cannot hold in.

FIG 01Alberta Electrical
Circular pipe section with an orange heating cable at the bottom of the pipe, surrounded by yellow insulation and an outer jacket, with notes on placement and dry insulation.Pipe cross-section with heat tracepipeheat cablejacketinsulationpipe wallCable is placed in thelower quadrant of ahorizontal pipe and heldwith glass tape oraluminium tape as themaker specifies.Insulation must be dryand sealed. Wet insulationmakes heat trace useless.Label: ELECTRIC TRACED
Cross-section of an insulated pipe with heating cable taped to the lower part of the pipe under insulation and a weatherproof jacket.

Designing it properly

Heat loss depends on pipe size, insulation thickness, the coldest expected temperature and wind exposure. From that, we choose a cable with enough output per metre, decide whether one run is enough or the pipe needs two, and add cable at every valve, flange and support that will draw heat away.

FIG 02Alberta Electrical
A horizontal pipe with an orange heating cable running along it, zigzagging over a valve and a flange and looping around a support, ending at an end seal.Extra cable at heat sinksvalvesupportflangeValves, flanges and pipe supports pull heat away.Extra cable is looped at each one, per the design.end seal
Side view of a traced pipe showing extra heating cable looped around a valve, a pipe support and a flange.

Circuit length matters too. Every cable type has a maximum run on a given breaker size, especially at cold start-up when self-regulating cable draws its highest current. Going past it causes nuisance trips on the coldest night of the year, which is exactly when you need it.

Control typeBest for
Ambient thermostatMany pipes in the same space, simple setup
Line-sensing thermostatOne pipe or one zone, lower energy use
Electronic controller with alarmSprinkler lines and critical systems

Sprinkler and critical lines

Fire sprinkler piping in cold areas needs extra care. Requirements for freeze protection of sprinkler systems come from the fire codes and sprinkler standards, and some systems need heat tracing that is monitored so a failure raises an alarm. We coordinate with your sprinkler contractor and the authority having jurisdiction so the heat tracing meets what they require.

For water lines that serve tenants, kitchens or processes, a monitored controller that alerts you to a tripped breaker or a failed cable is worth considering. Finding out from a text message is better than finding out from a flood.

SafetyIf a pipe has frozen

Shut off the water to that line if you can, and do not use open flame or a heat gun on it. Call a plumber for the pipe and an electrician for the heat trace. A frozen traced pipe often means a failed circuit that needs testing.

Common problems we find on older systems

Many calls we get are not for new installs, but for systems that never quite worked. A few patterns come up again and again in Edmonton buildings.

  • Cable run on top of the pipe instead of underneath, with no extra at valves.
  • Insulation left open at fittings, so the pipe freezes at the same valve every year.
  • Circuits too long for the breaker, tripping on cold start-up.
  • Plug-in cable on a permanent line, often with no ground-fault protection.
  • No labels, so nobody knows which breaker serves which pipe.

We can test, document and correct an existing installation, or replace it when that is the better value.

Installation and testing

We test the cable before it goes on the pipe, after it is installed, and again after insulation is closed up, using an insulation-resistance tester. That catches damage from a sharp edge or a staple before it becomes a ground fault in January.

Every power connection, splice and end seal uses the manufacturer's listed kit, made up exactly to instructions. Insulated pipes are labelled so the next trade knows there is live cable under the jacket. Circuits are labelled at the panel and controller, and you get a record of test values for future comparison.

Cost is driven by total pipe length, the number of valves and fittings, how much insulation needs removing and replacing, access (a ladder or a lift), the distance to a panel with space, and the controls. A short line in a crawlspace is a small job; a parkade full of sprinkler piping is a project.

Questions we hear

Can I just add heat tape myself?

Plug-in products exist, but they are a frequent cause of fires when installed wrong or used past their life. For permanent protection, a properly designed and protected circuit is the safe choice.

Does the cable go under the insulation?

Yes, in almost all cases. The insulation holds the heat against the pipe.

Will it work on plastic pipe?

Yes, with the right cable and installation method. Plastic pipe usually needs aluminium tape over the cable to spread heat.

How do I know it is working?

A controller with a status light or alarm tells you. Annual testing confirms the cable is still healthy.

How this job runs

What to expect

  1. Survey

    We trace the pipes at risk, measure lengths, count fittings and check insulation and power availability.

  2. Design

    Cable type, circuit lengths and controls are selected, and a permit is arranged.

  3. Install

    Cable and kits are installed and tested, insulation is coordinated, and the controller is wired.

  4. Commission

    Every circuit is tested and labelled, and you receive the test records and operating notes.

Related

More in Heat tracing

Service

Heat tracing

Heat tracing design, installation and maintenance for Edmonton homes, commercial buildings and industrial plants: pipes, roofs and gutters, and process lines.

View service →
Heat tracing

Roof and gutter de-icing

Roof, gutter and downspout de-icing cable for Edmonton homes and commercial buildings, with proper circuits, snow and moisture controls, and safe installation.

View service →
Heat tracing

Process heat tracing

Process heat tracing installation and upgrades for Alberta industrial sites: temperature maintenance, controls and monitoring, hazardous-location work and commissioning.

View service →
Heat tracing

Heat trace maintenance

Pre-winter inspection, testing and repair of heat tracing systems for Edmonton buildings and industrial sites, with records you can track year to year.

View service →

Guides

Read before you book

All guides →

Ready to book pipe heat tracing?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service