- Home
- Services
- Heat tracing
- Pipe heat tracing
Heat tracing
Pipe heat tracing
Freeze protection for water, sprinkler and drain lines that run through cold spaces.
Pipe heat tracing for Edmonton homes, commercial buildings and parkades: design, cable installation, controls, insulation coordination and testing.
Which pipes need it
Any pipe carrying water through a space that can drop below freezing is a candidate. In Edmonton that is a long list: parkades, loading docks, crawlspaces, attics, exterior walls in older buildings, and lines that cross a cold garage or run outside.
- Domestic water lines in unheated parkades and crawlspaces
- Fire sprinkler mains and branch lines in cold areas
- Drain and condensate lines, including roof drain leaders
- Water lines to trailers, outbuildings and livestock waterers
- Holding tanks and their fill lines
Insulation alone only slows heat loss. When the water stops moving overnight or over a long weekend at -30 C, an insulated pipe will still freeze. Heat tracing replaces the heat that the insulation cannot hold in.
Designing it properly
Heat loss depends on pipe size, insulation thickness, the coldest expected temperature and wind exposure. From that, we choose a cable with enough output per metre, decide whether one run is enough or the pipe needs two, and add cable at every valve, flange and support that will draw heat away.
Circuit length matters too. Every cable type has a maximum run on a given breaker size, especially at cold start-up when self-regulating cable draws its highest current. Going past it causes nuisance trips on the coldest night of the year, which is exactly when you need it.
| Control type | Best for |
|---|---|
| Ambient thermostat | Many pipes in the same space, simple setup |
| Line-sensing thermostat | One pipe or one zone, lower energy use |
| Electronic controller with alarm | Sprinkler lines and critical systems |
Sprinkler and critical lines
Fire sprinkler piping in cold areas needs extra care. Requirements for freeze protection of sprinkler systems come from the fire codes and sprinkler standards, and some systems need heat tracing that is monitored so a failure raises an alarm. We coordinate with your sprinkler contractor and the authority having jurisdiction so the heat tracing meets what they require.
For water lines that serve tenants, kitchens or processes, a monitored controller that alerts you to a tripped breaker or a failed cable is worth considering. Finding out from a text message is better than finding out from a flood.
Shut off the water to that line if you can, and do not use open flame or a heat gun on it. Call a plumber for the pipe and an electrician for the heat trace. A frozen traced pipe often means a failed circuit that needs testing.
Common problems we find on older systems
Many calls we get are not for new installs, but for systems that never quite worked. A few patterns come up again and again in Edmonton buildings.
- Cable run on top of the pipe instead of underneath, with no extra at valves.
- Insulation left open at fittings, so the pipe freezes at the same valve every year.
- Circuits too long for the breaker, tripping on cold start-up.
- Plug-in cable on a permanent line, often with no ground-fault protection.
- No labels, so nobody knows which breaker serves which pipe.
We can test, document and correct an existing installation, or replace it when that is the better value.
Installation and testing
We test the cable before it goes on the pipe, after it is installed, and again after insulation is closed up, using an insulation-resistance tester. That catches damage from a sharp edge or a staple before it becomes a ground fault in January.
Every power connection, splice and end seal uses the manufacturer's listed kit, made up exactly to instructions. Insulated pipes are labelled so the next trade knows there is live cable under the jacket. Circuits are labelled at the panel and controller, and you get a record of test values for future comparison.
Cost is driven by total pipe length, the number of valves and fittings, how much insulation needs removing and replacing, access (a ladder or a lift), the distance to a panel with space, and the controls. A short line in a crawlspace is a small job; a parkade full of sprinkler piping is a project.
Questions we hear
Can I just add heat tape myself?
Plug-in products exist, but they are a frequent cause of fires when installed wrong or used past their life. For permanent protection, a properly designed and protected circuit is the safe choice.
Does the cable go under the insulation?
Yes, in almost all cases. The insulation holds the heat against the pipe.
Will it work on plastic pipe?
Yes, with the right cable and installation method. Plastic pipe usually needs aluminium tape over the cable to spread heat.
How do I know it is working?
A controller with a status light or alarm tells you. Annual testing confirms the cable is still healthy.
How this job runs
What to expect
Survey
We trace the pipes at risk, measure lengths, count fittings and check insulation and power availability.
Design
Cable type, circuit lengths and controls are selected, and a permit is arranged.
Install
Cable and kits are installed and tested, insulation is coordinated, and the controller is wired.
Commission
Every circuit is tested and labelled, and you receive the test records and operating notes.
Related
More in Heat tracing
Heat tracing
Heat tracing design, installation and maintenance for Edmonton homes, commercial buildings and industrial plants: pipes, roofs and gutters, and process lines.
View service →Heat tracingRoof and gutter de-icing
Roof, gutter and downspout de-icing cable for Edmonton homes and commercial buildings, with proper circuits, snow and moisture controls, and safe installation.
View service →Heat tracingProcess heat tracing
Process heat tracing installation and upgrades for Alberta industrial sites: temperature maintenance, controls and monitoring, hazardous-location work and commissioning.
View service →Heat tracingHeat trace maintenance
Pre-winter inspection, testing and repair of heat tracing systems for Edmonton buildings and industrial sites, with records you can track year to year.
View service →Guides
Read before you book
Heat tracing basics: how heat trace keeps things from freezing
A plain-language introduction to electric heat tracing: what it is, where it is used in Edmonton, the parts of a proper system and why installation matters.
Read the guide →Winter, heating and heat tracing · 7 minSelf-regulating vs constant wattage heat trace
How the two main types of heating cable work, where each one makes sense, and the questions to ask before you choose.
Read the guide →Winter, heating and heat tracing · 8 minPreventing frozen pipes in an Edmonton winter
Where pipes freeze in Edmonton homes and buildings, simple habits that help, when heat trace makes sense and what to do safely if a pipe freezes.
Read the guide →Ready to book pipe heat tracing?
Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.