3400, 10180 101 St NW, Edmonton, AB T5J 3S424/7 service 1 (800) 716-8955
  1. Home
  2. Services
  3. Electrical design
  4. Permit drawings

Electrical design

Permit drawings

Clear drawings that get through review without bouncing back.

CommercialIndustrialResidential

Electrical permit drawings for Edmonton and Alberta projects: plans, single-line diagrams, panel schedules and load calculations, with engineer coordination where stamps are required.

When you need drawings

Not every electrical permit needs drawings. Many small residential jobs are permitted with a simple application. As projects grow, the permit authority usually wants to see what will be built before it is built. Commercial fit-outs, new services, larger renovations and industrial work often need a drawing package.

In Edmonton, the City reviews and issues electrical permits. Elsewhere in Alberta, the permit may come from the municipality or an accredited agency. Each sets its own submission requirements, so we check them before starting the drawings.

FIG 01Alberta Electrical
Flow of six boxes: drawings, submit, review in orange, issued, rough-in and final inspections in navy, with a dashed loop from review back to submit for revisions.Permit path for an electrical projectDrawingsSubmitReviewIssuedRough-inFinalcomments: reviseInspections are booked for work done under the permit.Inside Edmonton the City issues permits and inspects;elsewhere it depends on the municipality.
Drawings are submitted and reviewed, revised if there are comments, and then the permit is issued and inspections follow.

What goes in a drawing set

The content depends on the project. A typical commercial set might include:

FIG 02Alberta Electrical
Five stacked drawing sheets with title blocks numbered E-001 to E-601, with the panel schedules sheet highlighted orange, listed beside as legend, power plan, lighting plan, single-line and panel schedules.A typical electrical drawing setE-001 Legend, notesE-101 Power planE-201 Lighting planE-501 Single-lineE-601 Panel schedulesE-601Common sheets:E-001 Legend, notesE-101 Power planE-201 Lighting planE-501 Single-lineE-601 Panel schedulesSheets needed depend onthe project and thepermit authority.
A drawing set may include a legend and notes sheet, power and lighting plans, a single-line diagram and panel schedules.
  • A legend and general notes explaining symbols and requirements.
  • Power and lighting plans showing device and equipment locations.
  • A single-line diagram showing the service, panels and major feeders.
  • Panel schedules listing every circuit and its load.
  • A load calculation supporting the service and feeder sizes.

Stamped drawings

Some projects need drawings sealed by a professional engineer registered with APEGA. This usually depends on the size of the service, the occupancy and the complexity of the work, and the permit authority decides. When a stamp is needed, we work with an engineer and handle the coordination, so you are not managing two separate firms.

Good to knowAsk early

Engineering review and permit review both take time. Finding out a stamp is needed late in a project can delay your start date, so we confirm it at the beginning.

Avoiding resubmissions

The most common reasons drawings bounce back are missing information, mismatched panel schedules and load calculations, unclear equipment ratings and notes that do not match the plans. We cross-check every sheet before submitting, and if a reviewer comments, we respond quickly and resubmit.

We also make sure the drawings match what the other trades are doing. A panel shown on a wall that the architect has since moved, or a kitchen layout that changed after the equipment was ordered, is a common cause of comments. Coordination before submission saves time on both ends.

Our drawings are also built to be useful after the permit. Installers build from them, inspectors check against them, and you keep them as a record of what is in your building. Updated as-built versions are available at the end of the job through our online system.

Cost depends on project size, the number of sheets, how much existing information is available, whether site measurements are needed and whether engineering is required. Drawings for design-build projects are usually included in the overall price.

Projects that typically need drawings

Requirements vary by authority and scope, but these projects commonly need some form of electrical drawings or plans with the permit application:

  • Commercial tenant improvements and new restaurant or retail fit-outs.
  • New or upgraded commercial and industrial services.
  • Switchgear replacements and new distribution equipment.
  • Industrial retrofits and new production lines.
  • Larger solar and battery installations.
  • Multi-unit residential and mixed-use buildings.

For homes, a simple sketch or description is often enough for smaller jobs. When in doubt, ask us and we will confirm what the permit authority wants before any money is spent on drawings.

Questions we hear

How long does permit review take?

It varies with the permit authority, the time of year and the project. We submit complete packages to avoid delays caused by missing information.

Can you prepare drawings for another contractor's permit?

Yes. We can prepare drawings for a project another electrician will install, though the permit is held by the contractor doing the work.

Do homeowners need drawings?

Most small residential jobs do not. Larger work like service changes or a new suite may require more information. We check for you.

How this job runs

What to expect

  1. Confirm requirements

    We check with the permit authority on what your project needs and whether a stamp is required.

  2. Prepare drawings

    We prepare plans, single-lines, schedules and calculations, and review them with you.

  3. Submit

    We submit the package and respond to any reviewer comments until the permit is issued.

  4. Build and record

    Work proceeds under the permit, and we provide as-built drawings when it is done.

Related

More in Electrical design

Service

Electrical design

Electrical design services in Edmonton: layouts, load calculations, permit drawings and energy audits for homes, businesses and industrial sites.

View service →
Electrical design

Electrical design and layout

Electrical design and layout in Edmonton: device and lighting locations, circuit planning, panel placement and routing for homes, offices, shops and plants.

View service →
Electrical design

Load calculations

Electrical load calculations in Edmonton to size services and feeders, check room for EV chargers, heat pumps and renovations, and support permit applications.

View service →
Electrical design

Energy audits

Electrical energy audits for Edmonton businesses, industrial sites and homes: measure where power goes, find waste, and rank upgrades like LED lighting, controls and VFDs.

View service →

Guides

Read before you book

All guides →

Ready to book permit drawings?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service