- Home
- Services
- Electrical design
- Load calculations
Electrical design
Load calculations
Know whether your service can handle what you want to add.
Electrical load calculations in Edmonton to size services and feeders, check room for EV chargers, heat pumps and renovations, and support permit applications.
Why load calculations matter
Every electrical service has a limit. A 100 amp house service, a 400 amp shop service or a large industrial supply can only deliver so much before the main breaker trips or equipment overheats. A load calculation tells you how close you are to that limit and what happens when you add something new.
In Edmonton, we see this question come up constantly as people add EV chargers, heat pumps, air conditioning, hot tubs, basement suites and shop equipment. In businesses, it comes up with new kitchen equipment, server rooms, process machinery and expansions.
How the calculation works
The Canadian Electrical Code sets out how to calculate the minimum service or feeder size, in Section 8. The method depends on the type of building: single homes, apartments, commercial and industrial occupancies each have their own approach.
The method does not simply add up every nameplate. Not everything runs at full power at the same time, so the code applies demand factors to arrive at a realistic figure. Large loads like heating, air conditioning, EV chargers and ranges are handled in specific ways.
For existing buildings, actual demand data from your utility can sometimes support the decision, depending on what the code and permit authority allow for your situation.
When the numbers do not fit
If the calculation shows you are over, there are usually several options:
- A service upgrade to a larger supply.
- Load management, such as an EV energy management system that pauses charging when other loads are high.
- Choosing more efficient equipment, such as a heat pump instead of added resistance heat, where it suits.
- Moving some loads to a separate supply in commercial settings.
We explain each option and what drives its cost, so you can pick the one that fits your plans and budget.
Tell us about everything you might add, not just today's project. A calculation that includes planned loads can save a second upgrade.
What you receive
You get a written summary of the loads, the calculation method, the result and our recommendations. Permit authorities often ask for a load calculation with service changes, EV chargers and larger renovations, and our summary is prepared to support that application.
Cost depends mostly on building size and complexity, the number of loads to inventory, and whether a site visit or meter data review is needed. Simple residential calculations are quick; commercial and industrial calculations take more time.
Common Edmonton scenarios
These are the situations where we run load calculations most often:
- A 1960s or 1970s bungalow with a 60 or 100 amp service adding an EV charger.
- A house switching from a gas furnace to a heat pump with electric backup heat.
- A basement suite with its own kitchen and laundry.
- A detached garage with a heater, welder and compressor.
- A restaurant moving into a unit built for retail.
- A shop adding new machinery or a second shift.
In each case, the answer is rarely just yes or no. The calculation shows how much room there is and which option, upgrade or load management, makes the most sense.
Questions we hear
Can I add an EV charger to a 100 amp service?
Sometimes. It depends on your other loads, especially heating and cooking. A load calculation answers it, and load management can often make it work.
Is a load calculation required for a permit?
It is often requested for service changes and large added loads. The permit authority decides; we provide it when needed.
Why not just add up the breaker sizes?
Breaker sizes overstate real demand. The code method uses demand factors to reflect how loads actually run together.
How this job runs
What to expect
List loads
We record your existing service, panel and major loads, and list everything you plan to add.
Gather data
Where useful, we review utility demand data or nameplate information on site.
Calculate
We run the calculation using the CEC method for your building type.
Recommend
We explain the result and options, and provide a written summary for your records or permit.
Related
More in Electrical design
Electrical design
Electrical design services in Edmonton: layouts, load calculations, permit drawings and energy audits for homes, businesses and industrial sites.
View service →Electrical designElectrical design and layout
Electrical design and layout in Edmonton: device and lighting locations, circuit planning, panel placement and routing for homes, offices, shops and plants.
View service →Electrical designPermit drawings
Electrical permit drawings for Edmonton and Alberta projects: plans, single-line diagrams, panel schedules and load calculations, with engineer coordination where stamps are required.
View service →Electrical designEnergy audits
Electrical energy audits for Edmonton businesses, industrial sites and homes: measure where power goes, find waste, and rank upgrades like LED lighting, controls and VFDs.
View service →Guides
Read before you book
Planning the electrical for a tenant improvement
How to scope, design, permit and schedule the electrical side of a commercial tenant improvement in Edmonton, from base-building capacity to close-out documents.
Read the guide →Commercial and industrial · 7 minElectrical planning for restaurant kitchens
What restaurant owners need to plan for on the electrical side of a commercial kitchen: equipment voltage, capacity, hood interlocks, wet areas and refrigeration.
Read the guide →EV charging and solar · 7 minCan my panel handle an EV charger?
How an electrician decides whether your existing panel and service can carry a Level 2 charger, what older Edmonton homes run into, and the options when the answer is no.
Read the guide →Ready to book load calculations?
Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.