What restaurant owners need to plan for on the electrical side of a commercial kitchen: equipment voltage, capacity, hood interlocks, wet areas and refrigeration.

7 min readFor businesses3 illustrations

Why kitchens are different

A commercial kitchen packs more electrical load into a small space than almost any other business. Fryers, combi ovens, dishwashers, walk-in coolers and exhaust fans all run for long hours in a hot, wet, greasy room. Electrical mistakes show up quickly: breakers that trip at the dinner rush, equipment that underperforms, or an inspector who will not approve the opening.

Most of these problems can be avoided at the planning stage, before equipment is ordered and before the lease is signed.

Start with the equipment schedule

Collect the specification sheet for every piece of equipment and list its voltage, phase, load and connection type. This schedule drives the whole electrical design.

The most common mistake is a voltage mismatch. Many Edmonton commercial buildings supply 120/208 V three-phase, while a lot of cooking equipment is also sold in 240 V versions. A 240 V heating element on 208 V produces roughly a quarter less heat, so a fryer recovers slowly and an oven takes longer to reach temperature. Order equipment to match the building, or plan for the building to match the equipment.

Check on each spec sheetWhy it matters
Voltage and phaseMust match what the panel provides
Load (amps or kW)Feeds the load calculation and breaker sizing
Cord and plug or hard-wiredDecides the receptacle type or junction box
Location and heightSets where the connection goes on the wall or ceiling
Special requirementsDedicated circuit, GFCI compatibility, water connections
FIG 01Alberta Electrical
Kitchen floor plan with a fryer, griddle, range and oven under a dashed exhaust hood, each with a dedicated circuit. A hand sink and dish sink have GFCI receptacles, the prep table has ceiling cord drops, a walk-in cooler has its own circuit, a suppression pull station sits near the exit and the kitchen panel is in the office. EXHAUST HOOD OVER COOKLINE FRYER GRIDDLE RANGE OVEN HS DISH SINK DISHWASHER PREP TABLE WALK-IN COOLER SUPPRESSION PULL STATION OFFICE / ELEC KITCHEN PANEL DEDICATED CIRCUIT GFCI RECEPTACLE CORD DROP PULL STATION PANEL HS = HAND SINK. EVERY APPLIANCE CHECKED AGAINST ITS SPEC SHEET.
A sample kitchen layout showing dedicated circuits on the cookline, GFCI receptacles at sinks, cord drops at the prep table and the kitchen panel.

Hood suppression and automatic shut-off

Cooking equipment under a commercial hood is protected by a fire suppression system. When it discharges, power and gas to the appliances under the hood are normally shut off automatically. On the electrical side, that is done with a shunt-trip breaker or a contactor controlled by the suppression system.

FIG 02Alberta Electrical
Diagram: a hood fire suppression system triggers an orange shunt trip or contactor that turns off the fryer, griddle and range. It also closes the gas valve, sends a fire alarm signal and controls fans and make-up air as designed.WHEN THE HOOD SYSTEM DISCHARGES HOOD FIRE SUPPRESSION SHUNT TRIP OR CONTACTOR FRYER: OFF GRIDDLE: OFF RANGE: OFF GAS VALVE CLOSES FIRE ALARM SIGNAL FANS AND MAKE-UP AIR: PER DESIGN RESTART ONLY AFTER THE SUPPRESSION CONTRACTOR HAS SERVICED AND RESET THE SYSTEM.
When the hood suppression system discharges, it trips power to cooking equipment, closes the gas valve and signals the fire alarm.

How fans, make-up air and the fire alarm respond depends on the design, the suppression system's requirements and the fire code. The electrician, the suppression contractor and the mechanical contractor need to agree on the sequence before rough-in. This interlock is a common item on final inspections, so it should be tested before the inspector arrives.

Water, grease and ground fault protection

Kitchens are wet locations in practice, even where the drawings do not say so. The Canadian Electrical Code requires ground fault protection for many receptacles near sinks and in wet areas. The exact rules depend on the location and the type of receptacle, so the design should confirm each one.

  • Use wet-location rated covers and stainless or corrosion-resistant boxes near sinks and dish areas.
  • Keep receptacles above counter splash and away from steam outlets.
  • Use ceiling cord drops for island prep tables instead of floor boxes that collect water.
  • Check that dishwashers, ice machines and other equipment are compatible with ground fault protection where it is required, to avoid nuisance trips.
SafetyReport tripping, do not bypass it

If a GFCI or breaker trips repeatedly, staff should never tape it on or swap in a different device. Call an electrician to find the cause. Repeated trips in a wet kitchen are a warning, not an annoyance.

Refrigeration and the walk-in

Coolers and freezers hold your inventory. Give each refrigeration unit its own dedicated circuit so another appliance cannot trip it, and label those breakers clearly. Walk-ins also need power for lights, door heaters and evaporator fans, plus the condensing unit, which is often on the roof.

Consider a temperature alarm that calls a phone, and think about standby power if a long outage would mean throwing out stock.

Capacity, panels and the service

Restaurants regularly outgrow the electrical service that came with the space, especially in units that were offices or retail before. A load calculation based on your equipment schedule shows whether the existing feeder is enough.

FIG 03Alberta Electrical
Horizontal bars comparing load for office use, a mostly gas cafe and an all-electric kitchen against a dashed available capacity line. The all-electric bar extends past the line, with the excess shown in orange as shortfall.WILL THE EXISTING FEEDER COPE? OFFICE USE CAFE, MOSTLY GAS ALL-ELECTRIC KITCHEN AVAILABLE CAPACITY SHORTFALL ILLUSTRATIVE ONLY. A LOAD CALCULATION GIVES THE REAL ANSWER.
An office unit or a gas-heavy cafe may fit within an existing feeder; an all-electric kitchen often does not.

If the load does not fit, the options include a feeder or service upgrade, switching some equipment to gas, or choosing more efficient equipment. Plan a dedicated kitchen panel close to the cookline with spare spaces for the equipment you add after opening. See our guide to tenant improvements for the permit and inspection steps.

Common questions

Can I use equipment rated for 240 V on a 208 V supply?

Some equipment is dual-rated, but a 240 V heating appliance on 208 V produces noticeably less heat. Check the spec sheet and order the right voltage, or ask an electrician whether a transformer or different supply is practical.

Does every kitchen receptacle need GFCI protection?

Not necessarily. The CEC sets out where ground fault protection is required, based on location and receptacle type. Your electrician confirms each location in the design.

Who tests the hood interlock?

The suppression contractor services and tests the suppression system, and the electrician wires and verifies the electrical shut-off. Coordinate both so the test happens before final inspection.

How long does a restaurant electrical fit-out take?

It depends on scope, equipment lead times and whether a service upgrade is needed. Utility and switchgear work can add significant time, so check capacity early.

About this guideGeneral information, not a site assessment

Codes and permit rules change and every building is different. For work on your system, talk to a licensed electrician and your local permit authority.

Keep reading

More on commercial and industrial

All 13 guides →
Commercial and industrial · 6 min

Electrical for retail fit-outs

A practical guide to the electrical side of a retail store fit-out: landlord criteria, layered lighting, power and data for displays and point-of-sale, security and controls.

Read the guide →
Commercial and industrial · 7 min

How to choose a commercial electrical contractor

What to check before hiring an electrical contractor for a commercial or industrial project in Alberta: credentials, safety, insurance, how to compare quotes and red flags.

Read the guide →
Commercial and industrial · 7 min

Single-line diagrams and electrical documentation

Why accurate single-line diagrams, panel schedules and electrical records matter for safety and cost, how to read them, and how to keep them current.

Read the guide →

Need an electrician?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service