Working with electrical engineers on your project

When an Alberta electrical project needs a professional engineer, what the engineer and the electrical contractor each do, and how to keep design, permits and construction aligned.

7 min readFor businesses3 illustrations

When an engineer is involved

Many electrical jobs never need an engineer. A homeowner's panel upgrade or a small office lighting retrofit is designed and installed by a licensed electrical contractor. As projects get larger or more complex, a professional engineer registered with APEGA often becomes part of the team.

Common triggers include:

  • New buildings and major renovations where the building permit requires professional design
  • Large services, switchgear, medium-voltage equipment or significant changes to existing distribution
  • Assembly, care, institutional and high-hazard occupancies
  • Fire alarm systems, emergency power and life safety systems in larger buildings
  • Industrial processes, hazardous locations and complex motor control
  • Landlord or owner requirements, even where the code would not insist

Whether a seal is required for your project is set by the permit authority and the applicable codes. Ask early, because it changes the schedule. See commercial permit drawings for what the drawings contain.

Who does what

The roles are simple to describe and easy to blur on a busy job:

FIG 01Alberta Electrical
Diagram: the owner connects to the electrical engineer and the electrical contractor; drawings and answers flow from engineer to contractor and RFIs and shop drawings flow back; the engineer's permit drawings and the contractor's inspections both connect to the Safety Codes Officer.Owner / tenantsets needs, budgetElectrical engineerdesigns, seals,reviews on siteElectrical contractorbuilds, pulls permit,books inspectionsSafety Codes Officerreviews, inspectsdrawings, specs, answersRFIs, shop drawings, changespermit drawingsinspectionsArchitect / otherconsultants
The usual roles on an engineered electrical project and what passes between them.
RoleTypical responsibilities
Owner or tenantDefines needs, budget and schedule; approves changes
Electrical engineerDesigns, prepares and seals drawings, answers questions, reviews installation
Electrical contractorPrices and builds the work, pulls the electrical permit, books inspections
Safety Codes OfficerReviews where required and inspects for code compliance
Architect or prime consultantCoordinates disciplines on building projects

On smaller commercial jobs, roles can overlap. The architect may hire the electrical engineer, or the contractor may bring one in. Whatever the contract structure, make sure everyone knows who the designer of record is.

The engineer is responsible for the design. The contractor is responsible for installing it to the drawings and the code. When the two do not agree, the question goes back to the engineer through a formal request for information, not a hallway decision.

How the project usually runs

FIG 02Alberta Electrical
Six arrow-shaped phases: concept, design, permit set, tender, construction and close-out, with bars below showing engineer involvement across all phases, optional contractor design-assist early, contractor work from tender on, and inspections during construction.WHERE THE ENGINEER AND CONTRACTOR WORKConceptneeds, loadsDesignlayouts, SLDPermit setseal, submitTenderpricingBuildRFIs, reviewsClose-outas-builtsEngineer: design through permit, then field reviews and close-out lettersContractor input (design-assist)Contractor: price, build, inspectSafety Codes Officer inspectionsEarlier contractor input catches buildability and cost issuesbefore drawings are sealed and priced.
Project phases from concept to close-out, showing where the engineer, contractor and inspector are most active.
  1. Concept. The owner explains what the space must do. Rough loads and service needs are estimated.
  2. Design. Layouts, single-line diagrams, panel schedules and specifications take shape.
  3. Permit set. The engineer seals the drawings and they are submitted for review where required.
  4. Tender and award. Contractors price the work from the drawings.
  5. Construction. The contractor submits shop drawings, raises RFIs and builds. The engineer reviews on site and issues deficiency lists. The Safety Codes Officer inspects.
  6. Close-out. Testing, commissioning, as-built drawings and any professional-involvement letters the building permit requires.

Design-assist and design-build

Traditional projects separate design and construction. Two alternatives are common:

  • Design-assist. The contractor joins during design to advise on buildability, phasing, lead times and cost, while the engineer remains the designer of record.
  • Design-build. One team, often a contractor with an engineer engaged, delivers both design and construction under one contract.

For tenant improvements, retrofits in occupied buildings and anything with long-lead equipment like switchgear, early contractor input often saves time. Shutdown windows, existing conditions and equipment availability are hard to see from a drawing board.

TipSurvey before you design

Existing drawings in older Edmonton buildings are often out of date. A site survey of panels, feeders and spare capacity at the start avoids redesign later.

Before the first design meeting

You will get a better design, faster, if you bring the right information to the first meeting with your engineer and contractor:

  • A clear description of how the space will be used, including hours, occupancy and any special equipment
  • Equipment lists with electrical nameplate data where you have it, such as kitchen equipment, compressors or servers
  • Any existing drawings, panel schedules and past permit records for the building
  • Landlord requirements, tenant handbook and shutdown rules
  • Your target dates, especially move-in or production start, and any fixed constraints
  • Future plans: EV charging, solar, extra rooftop units or growth in staff can change today's service sizing

If budget is tight, say so early. Engineers can design to a budget much more easily than they can cut a finished design.

Keeping everyone aligned

FIG 03Alberta Electrical
Flowchart: a site question leads to a written RFI, the engineer answers or revises a drawing; if cost or schedule changes the owner approves a change order before work proceeds; otherwise work proceeds per the written answer and drawings are updated for as-builts.Site question orconflict foundContractor issueswritten RFIEngineer answersor revises drawingChange affects costor schedule?yesOwner approveschange ordernoWorkproceedsWork proceeds perthe written answerdrawings updated for as-builtsWritten answers protect owner, engineer and contractor alike.
How a request for information moves from site question to written answer and, if needed, an approved change.
  • One set of current drawings. Mark every revision clearly and retire old copies on site.
  • Written RFIs and answers. They protect everyone when questions come up months later.
  • Change management. Price and approve changes before work proceeds, especially when they affect load or equipment.
  • Shop drawing review. Confirm substituted equipment meets the design before it is ordered.
  • Shared reporting. Alberta Electrical's online job management gives owners and engineers visibility of progress, inspections and deficiencies.

We work with engineers on switchgear upgrades, plant retrofits and commercial fit-outs, and provide electrical design and layout directly where a seal is not required.

Common questions

Can an electrical contractor design the system without an engineer?

For many smaller projects, yes. Where the authority or codes require professional design, an engineer must prepare and seal the drawings.

Who pulls the electrical permit on an engineered job?

Typically the electrical contractor, who is responsible for the installation. The engineer's sealed drawings support the permit and any plan review.

What is an RFI?

A request for information: a written question from the contractor to the designer when the drawings are unclear, conflict or do not match site conditions.

Does the engineer inspect the work?

The engineer conducts field reviews to confirm the work follows the design. That is separate from the Safety Codes Officer's inspection for code compliance.

About this guideGeneral information, not a site assessment

Codes and permit rules change and every building is different. For work on your system, talk to a licensed electrician and your local permit authority.

Keep reading

More on permits, codes and inspections

All 13 guides →
Permits, codes and inspections · 7 min

Permits for EV chargers and solar in Alberta

EV chargers and solar systems both need electrical permits in Alberta, and solar also involves your wire owner under the Micro-generation Regulation. Here is how the approvals fit together.

Read the guide →
Permits, codes and inspections · 6 min

When you need an electrical permit in Alberta

Most new wiring, panel work and renovations in Alberta need an electrical permit under the Safety Codes Act. Here is how to tell, who issues it and why it protects you.

Read the guide →
Permits, codes and inspections · 6 min

Homeowner vs contractor electrical permits

Alberta lets some homeowners take out their own electrical permit. Here is who qualifies, what you take on when you do, and when a contractor permit is the better route.

Read the guide →

Need an electrician?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service