EV chargers and solar systems both need electrical permits in Alberta, and solar also involves your wire owner under the Micro-generation Regulation. Here is how the approvals fit together.

7 min readFor homeowners3 illustrations

Both need a permit

An EV charger and a solar system are both permanent electrical installations, so both need an electrical permit under the Alberta Safety Codes Act. In Edmonton that permit comes from the City; elsewhere from your local accredited municipality or an accredited agency.

The Canadian Electrical Code has dedicated sections for both: Section 86 for electric vehicle charging systems and Section 64 for renewable energy systems such as solar. Your electrician designs to the edition in force in Alberta and any Alberta STANDATA that applies.

Solar adds another layer, because it connects generation to the grid. That brings in your wire owner (EPCOR in Edmonton, or the local distribution company elsewhere) and Alberta's Micro-generation Regulation.

EV chargers: capacity comes first

A Level 2 charger is one of the largest continuous loads in a house. Before the permit, your electrician will do a load calculation to see whether your service can carry it.

  • It fits. A dedicated circuit is run from the panel to the charger location.
  • It does not fit. Options include a service upgrade or an EV energy management system, which the code recognizes as a way to share capacity safely.
  • Condos and townhouses. Common property and the building's electrical capacity are involved, so board approval usually comes before any permit.
FIG 01Alberta Electrical
Diagram: utility, meter and main panel feeding household loads and, through a highlighted load management device, an EV charger; a current sensor at the main measures total load and signals the device to slow or pause charging.EV CHARGER WITH LOAD MANAGEMENTutilitymetermain panelCTrange, dryerheat, A/Cload managementdeviceEVchargersenses total loadCharging slows or pauses whenthe house is near its limit.
How a load management device lets an EV charger share a home's service capacity.

Location matters too. Garage installs are simplest. Outdoor chargers in Edmonton need equipment rated for the location and for cold, and a cable route that will not be damaged by snow clearing.

Load management can avoid or delay a service upgrade in many older Edmonton homes with 100 A services. Whether it suits your home depends on your loads and driving habits. See EV load management.

TipBuy a certified charger

Chargers sold online without a recognized Canadian certification mark may not pass inspection. Check with your electrician before you buy.

Solar: the Micro-generation Regulation

Alberta's Micro-generation Regulation lets homes and businesses generate electricity from renewable or alternative sources, primarily to meet their own needs, and receive credit for what they export to the grid. The rules are overseen by the Alberta Utilities Commission.

In broad terms, a micro-generation system is sized to meet all or part of your own annual energy use, not to run as a power plant. Before connecting, you notify your wire owner through their micro-generation application process, and they confirm the connection and arrange metering.

FIG 02Alberta Electrical
Single-line diagram: solar modules feed an inverter, then a highlighted disconnect, the house panel, a bi-directional meter and the grid, with the DC side and AC side marked.GRID-TIED SOLAR, SIMPLIFIEDsolar modulesinverterdisconnectpanelkWhbi-directionalmetergridDC sideAC sideThe inverter converts DC from the modules to AC. Permits, labellingand disconnects follow the code; the meter belongs to the wire owner.
The main parts of a grid-tied solar system and how power flows from the modules to the grid.

Size limits, application forms and timelines are set by the regulation, the AUC and your wire owner, and they do change. We confirm the current requirements at the start of every project rather than relying on old numbers.

The usual order of approvals for solar

FIG 03Alberta Electrical
Six numbered steps: design sized to your use, notify the wire owner with a micro-generation application, permits, install, inspection by a Safety Codes Officer, then meter exchange and credits through the wire owner and retailer; steps two and five are highlighted.SOLAR MICRO-GENERATION: TYPICAL ORDER1Designsize to your use2Notify wire ownermicro-gen application3Permitselectrical, maybe building4Installmodules, inverter5InspectionSafety Codes Officer6Meter + creditswire owner, retailerSteps in orange involveoutside approvals, sostart them early.Exact forms and orderdepend on your wire ownerand permit authority.
A typical sequence for permitting and connecting a residential solar system in Alberta.
  1. Design. Review a year of bills, roof orientation and shading, and size the system to your use.
  2. Wire owner application. Submit the micro-generation application before installation.
  3. Permits. The electrical permit is always needed. Some municipalities also require a building permit for roof-mounted arrays; check yours.
  4. Installation. Modules, racking, inverter, disconnects and labelling.
  5. Inspection. A Safety Codes Officer inspects the electrical installation.
  6. Metering and credits. The wire owner installs or programs a bi-directional meter, and your retailer handles export credits.
SafetySolar circuits can stay live

Solar modules produce voltage whenever light hits them, even with the main breaker off. Never open combiner boxes, inverters or disconnect enclosures. Leave all work to a licensed journeyperson electrician.

Batteries and backup

Adding battery storage brings its own requirements for location, ventilation, separation and disconnects, and it may also need a building permit. If you want the system to keep running during an outage, it needs equipment that safely isolates your home from the grid, so it cannot back-feed utility lines.

Businesses follow the same principles at a larger scale. Commercial solar and fleet charging projects often need engineered drawings, utility studies and more detailed plan review, so start the approvals conversation as early as the design.

Thinking about a generator instead? Our transfer switches page covers the safe way to connect one.

How we handle it

For home EV chargers and residential solar, Alberta Electrical does the load calculation, pulls the electrical permit, coordinates with your wire owner on solar applications and books the inspections. You can follow every step through our online job reporting.

Planning both? Do the load calculation once with both in mind. It is easier to plan panel space and conduit for a future charger or array now. Our renovation planning checklist has more on future-proofing.

Common questions

Do I need a permit for a plug-in Level 1 charger?

Plugging a cord set into an existing standard receptacle usually does not need a permit. Adding a new receptacle or circuit for it does.

Can I install solar without telling the utility?

No. A grid-connected system must go through your wire owner's micro-generation process before it is connected. It also needs an electrical permit and inspection.

Will solar panels power my home during an outage?

A standard grid-tied system shuts down during an outage for line worker safety. Backup requires batteries or other equipment designed to isolate your home from the grid.

How big a solar system am I allowed?

Micro-generation systems are generally sized to your own annual consumption. Limits and details are set by the regulation and your wire owner, so confirm them at the design stage.

About this guideGeneral information, not a site assessment

Codes and permit rules change and every building is different. For work on your system, talk to a licensed electrician and your local permit authority.

Keep reading

More on permits, codes and inspections

All 13 guides →
Permits, codes and inspections · 7 min

The Canadian Electrical Code, explained simply

A plain-language tour of the Canadian Electrical Code: what it is, how Alberta adopts it, how it is organized and why some rules in your home exist.

Read the guide →
Permits, codes and inspections · 7 min

Basement development electrical rules: an overview

Finishing a basement in Edmonton? Here is an overview of the permits, electrical requirements and inspection sequence that shape a basement development.

Read the guide →
Permits, codes and inspections · 7 min

Electrical checks when buying or selling a home

What a home inspection does and does not cover for wiring, how to check permit history, and how to deal with unpermitted electrical work before it derails an Edmonton sale.

Read the guide →