3400, 10180 101 St NW, Edmonton, AB T5J 3S424/7 service 1 (800) 716-8955
  1. Home
  2. Services
  3. Building automation
  4. BAS installation

Building automation

BAS installation

Controllers, networks and wiring installed cleanly, documented fully and built on open protocols.

CommercialIndustrialResidential

Building automation system installation for new buildings, additions and control replacements across Alberta and BC: controllers, networks, sensors, wiring, graphics and commissioning.

A system built to last decades

A building automation system will likely outlive several generations of software updates. Choices made during installation decide whether it stays easy to service or becomes a puzzle. We build systems around open protocols, clear network layouts and labelled wiring, with documentation that matches what is in the ceiling.

Our licensed journeyperson electricians install the controllers, power and cabling, and our controls technicians program, set up graphics and commission. Because the same team handles both, problems between wiring and programming are solved quickly instead of passed back and forth.

  • New construction and additions
  • Replacing pneumatic or obsolete electronic controls
  • Adding equipment to an existing system
  • Bringing several buildings onto one front end

Networks and wiring

Most systems use an Ethernet backbone between supervisory and network controllers, with field bus trunks, such as BACnet MS/TP, connecting terminal unit controllers on each floor. Trunks need the right cable, polarity, shield handling and termination, or communications become slow and unreliable.

FIG 01Alberta Electrical
Building section with an orange vertical backbone from a supervisory controller on level 1 to network controllers on each floor, each with a chain of VAV controllers ending in a termination, an air handler controller on level 1 and a dashed link to a remote web interface.BAS network riser for a three-storey buildinglevel 3level 2level 1supervisorycontrollerAHU-1VAV controllers on adaisy-chained trunkend of lineOrange: Ethernet backbone. Thin lines: field bus trunks, one per floor.web UIremote
A network riser for a three-storey building: an Ethernet backbone rises through the building to floor controllers, each feeding a daisy-chained field bus of VAV controllers with end-of-line termination.

We keep BAS networks separate from tenant and office networks, or coordinate with your IT team where they share infrastructure. Remote access goes through secure, managed connections, not devices exposed directly to the internet.

Controllers and field devices

Each controller is mounted in an enclosure sized for future expansion, powered from a labelled circuit, and fed through a properly sized and fused 24 VAC transformer. Interposing relays let low-voltage outputs start larger equipment safely.

FIG 02Alberta Electrical
Enclosure with a breaker and yellow 24 VAC transformer at the top, a navy BAS controller and steel-blue relays in the middle, and terminal blocks at the bottom, with notes on the 120 V supply, network cabling and keeping voltages separate.Inside a typical BAS controller enclosure24 VAC transformerBAS controllerinputs / outputsrelays120 V from adedicated circuitnetwork in/outfield terminalsstarts fans,pumpsfused,Class 2keep line voltage and low voltage apart
A BAS controller enclosure with a fused 24 VAC transformer fed from a dedicated circuit, the controller, interposing relays for fans and pumps, and labelled field terminals.

We install temperature, humidity, pressure, CO2 and occupancy sensors where they will read the space correctly, not just where they are easiest to mount. A sensor on an exterior wall or above a photocopier will mislead the system all winter.

SafetyLeave control wiring to trained people

BAS enclosures often contain 120 V or higher circuits next to low-voltage wiring, and controllers start fans and pumps automatically. Do not open enclosures or change wiring; call a qualified technician.

Phasing and existing equipment

Few buildings can switch every system at once. We phase installations floor by floor or system by system, keeping heating running through the switch-over, which matters in an Edmonton January.

Existing equipment can often stay. Many rooftop units, boilers and drives already have communication cards or can accept one, and good existing sensors and valves can be reused. We check each device and recommend replacement only where it improves reliability or control.

  • Survey of reusable sensors, valves and actuators
  • Integration of equipment with built-in controls
  • Temporary controls during switch-over
  • Phased plans that match budgets

Graphics, commissioning and handover

Operators use the BAS through its graphics, so we build screens that show each system clearly, with live values, setpoints and alarm states. Schedules, trends and alarms are set up during commissioning and reviewed with your team.

Every point is checked from the device to the screen, and every sequence is tested before handover. You receive as-built drawings, a point list, sequences of operation, passwords and program backups in our online job management system. For the equipment sequences themselves, see HVAC controls, and to measure results, see energy metering.

Questions we hear

Can you replace old pneumatic controls?

Yes. Converting pneumatic controls to electronic direct digital control is common. It usually means new actuators and sensors, and it can be phased to suit budget and occupancy.

Which protocol do you use?

We generally favour BACnet because it is open and widely supported. We integrate other protocols, such as Modbus, where equipment requires it.

Can occupants stay in the building during installation?

Usually. We plan noisy and disruptive work around occupancy and keep heating and cooling running while each system is switched over.

Do we get the passwords and programs?

Yes. You own the system, so we hand over administrator credentials, program backups and documentation at completion.

How this job runs

What to expect

  1. Survey and design

    We review drawings and existing equipment and produce a point list, network design and sequence summary.

  2. Install

    Electricians mount controllers, run cable and install sensors and relays, working around occupants.

  3. Program and check out

    Controllers are programmed, graphics are built and every point is checked end to end.

  4. Commission and hand over

    Sequences are tested and tuned, operators are trained and documentation is delivered.

Related

More in Building automation

Service

Building automation

Building automation for commercial, institutional and multi-family buildings across Alberta and British Columbia: BAS installation, HVAC controls, lighting control systems and energy metering.

View service →
Building automation

HVAC controls

HVAC controls for air handlers, rooftop units, boilers, heat pumps and terminal units in commercial and multi-family buildings across Alberta and BC: new sequences, retrofits, tuning and troubleshooting.

View service →
Building automation

Lighting control systems

Occupancy sensing, daylight harvesting, scheduling and networked lighting controls for offices, schools, warehouses, retail and multi-family buildings across Alberta and British Columbia.

View service →
Building automation

Energy metering

Electrical, gas and water submetering for commercial, industrial and multi-family buildings across Alberta and BC, connected to your BAS or an energy dashboard.

View service →

Guides

Read before you book

All guides →
Instrumentation, controls and automation · 7 min

What a building automation system does

A plain-language look at building automation: what it controls, how it is put together, and how owners and operators use it to save energy and catch problems early.

Read the guide →
Instrumentation, controls and automation · 7 min

Building automation for small and mid-size buildings

Practical building automation options for offices, retail, clinics, churches, schools and light industrial buildings, and how to choose one you can live with for years.

Read the guide →
Instrumentation, controls and automation · 7 min

Sub-metering and energy dashboards that actually get used

How electrical sub-metering works, where meters pay off, what to show on an energy dashboard, and the rules to know before you bill tenants.

Read the guide →

Ready to book bas installation?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service