- Home
- Services
- Building automation
- Lighting control systems
Building automation
Lighting control systems
Lights that follow the schedule, the sun and the people in the room.
Occupancy sensing, daylight harvesting, scheduling and networked lighting controls for offices, schools, warehouses, retail and multi-family buildings across Alberta and British Columbia.
Why control lighting
LED fixtures use far less energy than the lamps they replaced, but a light that is on in an empty room still wastes power. Lighting controls turn lights off when nobody is there, dim them when daylight is available, and keep a building from glowing all night.
Controls also make spaces nicer to use: meeting rooms with scenes for presentations, warehouses where aisles light up as a forklift arrives, and corridors that stay safely lit at night without running at full output.
The main types of control
| Control | What it does | Good for |
|---|---|---|
| Occupancy sensor | Turns lights on and off with presence | Washrooms, storage, warehouses |
| Vacancy sensor | Manual on, automatic off | Private offices, meeting rooms |
| Daylight sensor | Dims fixtures near windows | Perimeter zones, skylit areas |
| Time schedule | Turns zones off after hours | Open offices, retail, exteriors |
| Networked controls | Each fixture addressable and adjustable | Larger buildings, changing layouts |
Most buildings use a mix. We look at how each space is used, then choose the simplest control that does the job. Overly complex systems that nobody understands tend to end up overridden and left on.
Codes and energy rules
Energy codes for new buildings and major renovations often require automatic lighting controls such as shut-off, occupancy sensing and daylight controls. What applies depends on the building, the type of space and the code edition in force in your municipality in Alberta or BC. We confirm the requirements with your designer and the permit authority before work begins.
Lighting control wiring follows the Canadian Electrical Code as adopted in the province, and needs the appropriate permit. Emergency and exit lighting must keep working whatever the controls do, so we wire and test those circuits to stay on when required.
Emergency lighting must operate when it is needed, regardless of switches, schedules or sensors. Changes to emergency lighting circuits should only be made by a licensed electrician with the code requirements in mind.
Warehouses, parkades and exteriors
Some of the biggest savings are in large spaces that are often empty. Warehouse aisles can be lit only when someone is working in them. Parkade lighting can drop to a lower level when no vehicles or people are moving, while still meeting the required lighting levels.
Exterior lighting can follow photocells and astronomical time clocks that adjust to Edmonton's long summer evenings and short winter days. We pair these with outdoor security lighting so sites stay safe and well lit when it counts.
Schedules, integration and tuning
Schedules handle the predictable part of the day. Sensors and overrides handle the rest. We set schedules with you, add after-hours overrides that time out on their own, and tune sensor timeouts and daylight levels after people move in.
Lighting controls can stand alone or connect to your building automation system, so one schedule drives both lighting and HVAC. Pairing controls with LED retrofits or office lighting upgrades usually gives the best result, and energy metering shows the savings.
Questions we hear
Will occupancy sensors turn lights off on people?
Not if they are the right type, placed well and tuned properly. Desk areas often need sensors that detect small movements, and timeouts can be adjusted after people move in.
Can lighting controls be added to existing fixtures?
Often, yes. Many fixtures can be controlled through wall sensors or relay panels. Dimming and fixture-level control depend on the fixture and driver.
Do lighting controls work with LED fixtures?
Yes, as long as the controls and drivers are compatible. We check compatibility before installation to avoid flicker or dropout.
Are lighting controls required by code?
In many new buildings and major renovations, some automatic controls are required by energy codes. It depends on the project, so we confirm with the designer and permit authority.
How this job runs
What to expect
Survey spaces
We walk the building, note how each space is used and review fixtures, circuits and any code requirements.
Design the controls
We choose devices, zones and schedules and explain the options and what drives the cost.
Install and program
Licensed electricians install sensors, panels and wiring, then program zones and schedules.
Tune and train
After occupancy we fine-tune timeouts and daylight levels and show staff how to use overrides.
Related
More in Building automation
Building automation
Building automation for commercial, institutional and multi-family buildings across Alberta and British Columbia: BAS installation, HVAC controls, lighting control systems and energy metering.
View service →Building automationBAS installation
Building automation system installation for new buildings, additions and control replacements across Alberta and BC: controllers, networks, sensors, wiring, graphics and commissioning.
View service →Building automationHVAC controls
HVAC controls for air handlers, rooftop units, boilers, heat pumps and terminal units in commercial and multi-family buildings across Alberta and BC: new sequences, retrofits, tuning and troubleshooting.
View service →Building automationEnergy metering
Electrical, gas and water submetering for commercial, industrial and multi-family buildings across Alberta and BC, connected to your BAS or an energy dashboard.
View service →Guides
Read before you book
What a building automation system does
A plain-language look at building automation: what it controls, how it is put together, and how owners and operators use it to save energy and catch problems early.
Read the guide →Instrumentation, controls and automation · 7 minBuilding automation for small and mid-size buildings
Practical building automation options for offices, retail, clinics, churches, schools and light industrial buildings, and how to choose one you can live with for years.
Read the guide →Instrumentation, controls and automation · 7 min4-20 mA loops explained for owners and operators
What a 4-20 mA signal is, why industry still relies on it, how to read one, and what usually goes wrong with analog instrument loops.
Read the guide →Ready to book lighting control systems?
Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.