- Home
- Services
- Building automation
- Energy metering
Building automation
Energy metering
See where your energy goes, find the waste and prove the savings.
Electrical, gas and water submetering for commercial, industrial and multi-family buildings across Alberta and BC, connected to your BAS or an energy dashboard.
You cannot manage what you cannot see
A utility bill tells you how much the building used, not where it went. Was it the rooftop units, the parkade heaters, the EV chargers or a compressor that never shuts off? Submetering answers those questions and turns guesses into data.
We install meters on the main service and key feeders, connect them to your building automation system or an energy dashboard, and set up trends and reports that your team will actually look at.
What to meter
- Main service: a building-level meter you control, to compare with the utility bill and see demand in real time.
- Large loads: HVAC, chillers, make-up air, process equipment and EV charging.
- Lighting and plug loads: to see what runs after hours.
- Tenants or departments: to allocate costs fairly and encourage savings.
- Generation and storage: solar output and battery storage where present.
- Gas and water: integrated from pulse or communicating meters.
A good metering plan starts with the questions you want answered and the decisions it will support. We help you place meters where they will be useful without metering every circuit.
If you plan to bill tenants for electricity based on submeters, federal Measurement Canada rules can apply to the meters used. Requirements depend on your situation, so confirm them before you choose meters, and we will install to suit.
Demand, peaks and what drives the bill
Many commercial electricity bills include charges based on peak demand, not only total energy. A building that starts every rooftop unit, heater and charger at 7 a.m. on a cold morning can set a high peak for the whole billing period.
Interval data from meters shows when peaks happen. Simple control changes, like staggering equipment start-up or using EV load management, can lower them. How much that saves depends on your rate and your building, so check your own bill and tariff.
Turning data into action
Data only helps if someone looks at it. We set up simple views and regular reports that show what changed, what is unusual and where to act.
- Night and weekend base load compared with occupied hours
- Peak demand days and what caused them
- Equipment running outside its schedule
- Before and after comparisons for upgrades
Paired with HVAC controls and lighting control systems, metering closes the loop: find the waste, fix it, then confirm the savings in the data.
Installation and accuracy
Electrical submeters use current transformers around the conductors and voltage connections inside the switchboard or panel. That is work for a licensed journeyperson electrician, done de-energized where possible and always under proper safety procedures. Meter accuracy depends on correct CT sizing, orientation and phase matching, which we verify at commissioning.
Installing CTs and voltage taps means working inside switchboards and panels. Never open panel covers to add a meter yourself; call a licensed electrician.
Meters connect over BACnet, Modbus or similar protocols, and we check that the data arrives correctly, with the right scaling and units, on your dashboard. Results and reports are available through our online job management system, and our energy audits can turn the data into a prioritized plan.
Questions we hear
Can meters be installed without a shutdown?
Some meters use split-core CTs that can go around existing conductors, but working inside energized equipment carries real risk. Whether a shutdown is needed depends on the equipment and the safest method, which we plan with you.
Can we use submeters to bill tenants?
Possibly. Federal Measurement Canada rules may apply to meters used for billing, so confirm requirements before choosing meters. We install meters to suit the approach you choose.
Do we need a BAS to use energy meters?
No. Meters can report to a standalone energy dashboard. If you have a BAS, connecting them there puts energy data next to the equipment that uses it.
Will metering save energy by itself?
Meters do not save energy on their own. They show where to act and prove what worked. The savings come from the changes you make with that information.
How this job runs
What to expect
Set the goals
We agree on what you want to learn, such as cost allocation, peak demand or proving savings, and review your bills.
Plan the meters
We choose meter points, meter types and communication, and check panel space and outage needs.
Install and connect
Licensed electricians install meters and CTs, and data is connected to your BAS or dashboard.
Verify and report
We check readings against reference values, set up trends and reports and train your team.
Related
More in Building automation
Building automation
Building automation for commercial, institutional and multi-family buildings across Alberta and British Columbia: BAS installation, HVAC controls, lighting control systems and energy metering.
View service →Building automationBAS installation
Building automation system installation for new buildings, additions and control replacements across Alberta and BC: controllers, networks, sensors, wiring, graphics and commissioning.
View service →Building automationHVAC controls
HVAC controls for air handlers, rooftop units, boilers, heat pumps and terminal units in commercial and multi-family buildings across Alberta and BC: new sequences, retrofits, tuning and troubleshooting.
View service →Building automationLighting control systems
Occupancy sensing, daylight harvesting, scheduling and networked lighting controls for offices, schools, warehouses, retail and multi-family buildings across Alberta and British Columbia.
View service →Guides
Read before you book
What a building automation system does
A plain-language look at building automation: what it controls, how it is put together, and how owners and operators use it to save energy and catch problems early.
Read the guide →Instrumentation, controls and automation · 7 minBuilding automation for small and mid-size buildings
Practical building automation options for offices, retail, clinics, churches, schools and light industrial buildings, and how to choose one you can live with for years.
Read the guide →Instrumentation, controls and automation · 7 minSub-metering and energy dashboards that actually get used
How electrical sub-metering works, where meters pay off, what to show on an energy dashboard, and the rules to know before you bill tenants.
Read the guide →Ready to book energy metering?
Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.