3400, 10180 101 St NW, Edmonton, AB T5J 3S424/7 service 1 (800) 716-8955
  1. Home
  2. Services
  3. Controls and automation
  4. Control panels

Controls and automation

Control panels

Panels built neatly, labelled clearly and approved before they are energized.

CommercialIndustrial

Design, build, installation and modification of industrial control panels for pumps, machines and processes in Alberta and British Columbia, with approval and full documentation.

A good panel is easy to live with

A control panel is where your process logic, power and field wiring meet. A good one is laid out logically, with room to work, every wire labelled, and drawings that match. A poor one becomes a maze of unlabelled wires that slows down every repair.

We design and build panels for pump stations, lift stations, compressors, conveyors, process skids and machinery. Our builds put power components together, keep low-voltage control wiring separate, and leave spare space for future I/O.

FIG 01Alberta Electrical
Panel outline with an orange main disconnect top left, branch breakers and a 24 VDC power supply beside it, dashed wireways, a PLC and relay row, and a row of terminal blocks at the bottom where field cables enter.Control panel backplate layoutmaindisconnect24 VDC PSUPLC + I/Orelaysincoming powerbreakers / fuseswirewaylow-voltagecontrol zonefield terminalspower zonekept apartlabelled todrawingsfield cable
A typical control panel backplate, with the main disconnect and power devices at the top, the PLC and relays in the middle, wireways between rows and labelled field terminals at the bottom.

Approval comes before power

In Canada, a control panel must be approved before it is put into service. That normally means it carries a certification mark from an accredited certification body, or it is field evaluated and labelled by an accredited inspection body. Which route fits depends on the panel and how it is built, so we settle that at the design stage.

Panels and their field wiring follow the Canadian Electrical Code as adopted in Alberta or BC, and installation needs an electrical permit from the right authority: a Safety Codes Act permit in Alberta, including the City of Edmonton's own permits within the city, or Technical Safety BC or a municipal authority in BC.

Good to knowModifying an approved panel

Adding devices to an approved panel can affect its approval. Small changes may be fine, but larger ones may need re-evaluation. Ask before you add that drive or extra breaker.

Designed for the operator and the environment

Operators should be able to see what the equipment is doing and act quickly. Door layouts put status, alarms and controls where people expect them, with an emergency stop that is easy to reach where the safety design calls for one.

FIG 02Alberta Electrical
Panel door with an HMI touchscreen, an orange emergency stop button, fault, run and reset indicators, a hand-off-auto selector switch, a disconnect handle and a nameplate.Panel door: what the operator seesHMI touchscreenH O Anameplate / tage-stopstatus, alarmsfault lamprun lamphand-off-autodisconnecthandlereset
A control panel door laid out for the operator, with an HMI, emergency stop, status lamps, a hand-off-auto selector, a lockable disconnect handle and a nameplate.

The enclosure has to suit where it lives. Outdoor panels in Alberta and BC face snow, wind-driven rain and -30 C or colder, so we specify enclosure ratings, heaters, thermostats and sometimes cooling for sunny summers. Panels in hazardous locations need enclosures and protection methods certified for the classification.

  • Enclosure rating to suit dust, water, washdown or corrosion
  • Space heaters and thermostats for cold-weather sites
  • Ventilation or cooling for drives and summer heat
  • Lockable disconnects and arc flash labelling where required
  • Spare DIN rail, terminal space and I/O capacity

Modifying existing panels

Many panel jobs are changes to equipment already in service: adding a starter, a drive, more I/O or a new interlock. We start by checking available space, heat load, power supply capacity and the approval label, then plan the change so it fits neatly rather than squeezing devices into whatever room is left.

The drawings are updated to match, new wires are labelled to your numbering scheme and the work is tested before the panel goes back into service. Our motor controls and industrial maintenance teams often handle these changes as part of planned shutdowns.

Testing before it ships

Before a new panel leaves the shop, we run a factory acceptance test: point-to-point wiring checks, insulation tests, powering up, I/O checks and a run-through of the PLC program where one is included. Problems found on the bench take minutes to fix; the same problems found on site during a shutdown can cost hours.

On site, our licensed journeyperson electricians set the panel, run and terminate field wiring and work with our instrument technicians on loop checks and commissioning. As-built drawings and test records go into our online job management system, and work is backed by our 100% satisfaction guarantee.

Questions we hear

Can you modify a panel another company built?

Yes. We review the drawings and the approval label first, since larger changes may affect the approval, then plan the modification and update the drawings.

Do panels need special approval in Canada?

Yes. Electrical equipment, including control panels, must be approved before use, typically by a certification mark or field evaluation from an accredited body. We plan for this from the start.

Can you build panels for outdoor or hazardous areas?

Yes. We select enclosures and protection methods suited to the environment and the area classification, including heaters for cold-weather sites.

Will you supply the PLC program too?

We can. Many panels include a PLC we program ourselves, see PLC systems, or we can build to your integrator's design.

How this job runs

What to expect

  1. Define the panel

    We confirm the function, I/O, power, enclosure and environment, and choose the approval route.

  2. Design and draw

    We produce schematics, a layout and a bill of materials for your review before building.

  3. Build and test

    The panel is built, labelled and factory tested, then approved by marking or field evaluation as planned.

  4. Install and commission

    We install, wire and commission on site, and hand over as-built drawings and test records.

Related

More in Controls and automation

Service

Controls and automation

Industrial controls and automation across Alberta and British Columbia: PLC systems, custom control panels, SCADA and remote monitoring, and migrations off obsolete control platforms.

View service →
Controls and automation

PLC systems

PLC and HMI programming, modifications, troubleshooting and support for industrial and municipal systems across Alberta and BC, with commented code and current backups.

View service →
Controls and automation

SCADA and remote monitoring

SCADA, telemetry and remote monitoring for pump stations, lift stations, reservoirs, well sites and plants across Alberta and BC, with secure communications and alarm callout.

View service →
Controls and automation

Controls migration

Planned migration from obsolete PLCs, relay panels, legacy HMIs and SCADA to supported platforms, with short cutovers and full documentation, for facilities across Alberta and BC.

View service →

Guides

Read before you book

All guides →

Ready to book control panels?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service