Every signal proven from the field to the screen before your process starts up.

CommercialIndustrial

Instrument loop checks, function testing and commissioning support for new plants, expansions and control upgrades in Alberta and British Columbia, with signed loop sheets and a clean punch list.

What a loop check proves

A loop check proves that a signal leaving a field instrument arrives at the right place in the control system, with the right value, and shows up correctly on the operator's screen. It sounds simple. On a new facility with hundreds of loops, it is where swapped wires, wrong scaling and mislabelled tags get caught before they cause a problem at start-up.

Our instrument technicians check each loop end to end, with an operator or controls specialist at the HMI where possible, and sign off loop sheets as each one passes.

FIG 01Alberta Electrical
Five boxes linked by an orange line: field device, junction box, marshalling terminals, I/O card and HMI screen, each with a numbered orange circle and a list of what is checked at that stage.Loop check: proving the whole signal pathfield deviceFT-103junctionboxmarshallingterminalsI/O cardAI ch. 3HMI screentag + alarm123451 Correct device, tag, range, config2 Terminations, shields, labels3 Cable continuity and insulation4 Right channel, scaling, units5 Displayed value, alarms, trendsInject 0, 50, 100%at the device and confirmthe HMI shows the samevalue at every point.
The signal path a loop check proves, from the field device through the junction box, marshalling terminals and I/O card to the operator screen, with the item checked at each point.

Analog, discrete and control loops

Each kind of loop has its own checks:

  • Analog inputs: we inject or simulate known values at the device, typically at zero, mid and full scale, and confirm the control system shows the matching engineering value.
  • Discrete inputs: we operate or simulate each switch and confirm the state change and any alarm it triggers.
  • Analog outputs: we command a valve or drive from the control system and confirm the device moves to the matching position or speed.
  • Discrete outputs: we command solenoids, starters and lights and confirm they respond, with the process isolated as required.

Problems are written up on a punch list with the loop number, what was found and what fixed it. Nothing is signed off until it passes.

Commissioning beyond the loop check

Once individual loops are proven, the system has to work as a whole. Function testing checks that interlocks, permissives, alarms and sequences behave as the control narrative says they should. We work with your engineer, integrator or our own PLC systems team to run these tests and record the results.

FIG 02Alberta Electrical
Six arrow-shaped stages in a row: install, inspect, loop check (highlighted orange), function test, ready review and start-up, with a note under the first four describing what each covers.From construction to start-upInstallInspectLoopcheckFunctiontestReadyreviewStart-updevices mounted, cable pulledterminations, megger, labelsevery signal proven end to endinterlocks, sequences, tripsPunch list items are logged and closed at each stage.
The commissioning sequence for instrumentation and controls, from installation and inspection through loop checks and function tests to the pre-start-up review and start-up.
SafetyTesting must not start the process

Loop checks and function tests can move valves, start motors and trip equipment. Each test needs the right isolations, communication with operations and your site's permits in place. We will not test outside those controls.

Getting ready for loop checks

Loop checks go fastest on a site that is ready for them. Before we book a crew, we check that the basics are in place, so the technicians spend their time proving loops instead of waiting.

  • Instruments installed, tubed and terminated
  • Cable insulation and continuity tested
  • Control system powered, with I/O configured
  • Loop drawings and I/O list at the current revision
  • Operations aware of what will be tested and when

If some of these are not ready, we can help close the gaps, from finishing terminations to updating loop drawings, so commissioning starts on schedule.

Expansions, upgrades and turnarounds

Not every commissioning job is a new plant. When you add a line, replace a control system or swap out instruments during a turnaround, the affected loops still need proving. We scope exactly which loops changed and check those, plus any shared wiring or I/O that may have been disturbed.

For controls migrations, loop checks after cutover are what confirm that the new system reads every field device the same way the old one did. We plan them to fit inside the shutdown window.

At the end, you receive signed loop sheets, the closed punch list and marked-up drawings in our online job management system, ready to hand to operations and to your drafting team for as-builts.

Questions we hear

Can you loop check a system someone else installed?

Yes. Third-party loop checking is common, and an independent check is a good way to find installation errors before start-up.

Do we need the control system programmed first?

Ideally the I/O configuration and HMI tags are in place so values can be confirmed on screen. If not, we can check to the I/O card and come back for the screen checks later.

How long do loop checks take?

It depends on the number and type of loops, access, and how ready the site is. A clean, well-documented installation goes much faster, so we review readiness before booking crews.

Do you provide start-up support?

Yes. Our technicians can stay on site through start-up to troubleshoot instruments and wiring as the process comes up.

How this job runs

What to expect

  1. Review documents

    We collect the instrument index, loop drawings, I/O list and control narrative, and agree on the test method and sign-off.

  2. Inspect and pre-test

    We inspect installations and terminations and test cable insulation and continuity before any loop is energized.

  3. Check and test loops

    Each loop is checked end to end, then interlocks and sequences are function tested with operations.

  4. Close out

    Punch list items are fixed and re-tested, and signed loop sheets and markups are delivered for handover.

Related

More in Instrumentation

Service

Instrumentation

Instrumentation services across Alberta and British Columbia: installing field instruments, calibrating them, loop checking and commissioning, and fixed gas detection, with records your team can trust.

View service →
Instrumentation

Field instrumentation

Installation of pressure, level, flow and temperature instruments, analyzers and valve instrumentation, with tubing, wiring and documentation, for plants and facilities across Alberta and BC.

View service →
Instrumentation

Instrument calibration

Bench and in-place calibration of pressure, temperature, level and flow instruments, with as-found and as-left records, for facilities across Alberta and British Columbia.

View service →
Instrumentation

Gas detection

Fixed toxic and combustible gas detection systems for plants, parkades, mechanical rooms, shops and facilities in Alberta and BC: installation, wiring, controller setup, testing and maintenance.

View service →

Guides

Read before you book

All guides →

Ready to book loop checks and commissioning?

Call the 24/7 line or send a request and we'll set up a consultation and a free estimate.

Call 24/7Request service